Monday, August 31, 2009

Almost Complete: Walk-Through Was Today!!!


Today the painters were hard at work taping, sanding, and painting the exterior of the house. By 3pm about 1/2 of the house was painted with at least one coat. While we were there, they were working on the front of the house painting garage doors, our pillars and railing, and window trim. Also, the fence was completed by the afternoon and looks fantastic. Tomorrow will be final grading and sod. By Thursday the entire house will be completed, clean, and ready for us to move in on Friday. Whoo hooo! 3 days left and it's ours!!!



Friday, August 28, 2009

More Photos... and a little more progress

Stopping out at the house yesterday over lunch and no one was there. It's been rainy, so assuming they can't grate or sod or paint until it dries up. I did notice, however, that the sprinklers were installed around the yard. We have tons of sprinkler heads, so shouldn't be a problem getting our lawn watered very well. Our thermostat and humidifier controls were also installed this week. The remaining pics are just new ones of our freshly cleaned house. A couple days ago I visited, sat in the tub (to make sure it was big enough -- it was. Ha!) and laid on the floor of our master bedroom trying to take it all in. Yes, I thought. Yes, I can live here. :)

I just want to start decorating, hanging art, putting rugs down and towels in the bathrooms, but I must sadly wait. Call me a nerd, but the excitement is making me a lil' crazy. :)




Wednesday, August 26, 2009

Interior Complete: Cleaning Crew At Work

Well the exterior needs some work, but lots of rain today and in the forecast so that will set us back a few days. Today the cleaning crew was at our house vacumming, dusting, cleaning windows and mirrors, polishing floors, and sweeping the basement. They are hard at work making the inside all sparkling clean and pretty. It was great to see those shiny kitchen floors again! A few minor fixes to be repaired and the gas stove and garage door openers still need to be installed, but besides that... the inside is done! Whooo hooo! The remaining exterior projects include grating our land one last time(1/2 day), installing sprinklers (1 day), and laying sod (1 day). I think that's about it!!! Not too bad. We're closing in 9 days!!!


Our formal dining room floors (carpeted and look great)


Shelving installed in our kitchen cabinets


Pantry in Kitchen (one of my favorites about the house) :)


Master Closet Shelving (another shelf on opposite side)


Laundry Room on 2nd Level

Tuesday, August 25, 2009

And The Countdown Begins... 3 Days Left until Completion

This week Dustin is out of town on business, so it's just me to see the excitement of our house during its final week of completion. Scheduled to be done this week, each day I've seen more and more finishing touches. Full electrical was completed, carpeting was installed in Monday as well as the fence post installation. Tuesday (today) I found our front storm door was installed, the screen to our sliding patio door was put in as well as the shelving throughout the house. We're still waiting on exterior paint, sprinkler systems, garage door openers, installation of the gas stove, final grating of our yard and placement of sod. Besides that and a few minor repairs, we're a "GO" for closing next week. Too excited to words!!! :)





Sunday, August 23, 2009

Lighting & Electrical

This week our electrical, appliances and light fixtures were put in. We have our Dishwasher and Microwave installed, all of our electrical outlets are in (there are a ton!) and our light switches as well. We also have our bathroom mirrors installed, the rest of our plumbing fixtures and the tack strips for carptet are in. They also installed the control box for the sprinkler system.

We are getting extremely close to being done and are more excited than ever. We visited the house yesterday afternoon and went again at night so we could see it with all of our light fixtures on (sad, I know).




House Pictures at Night with our new lights on!!! :)
Our front porch...
The Entry Way
The kitchen at night... (It looks like Heaven)

Our (my) closet! ;-)
Our unfinished basement...

Wednesday, August 19, 2009

Plumbing, Railing and More!

Today we were met with more surprises. We now have our railing on the front porch installed! It makes it look so finished. We are glad it's finally up. Hopefully we'll get the house painted this week now that it's up.

Now for the inside, we now have our dishwasher installed and some other plumbing fixtures including our faucets, shower heads/handles, toilets and our pedestal sink on the main floor. The construction door was removed and our permanent door was installed. They have added all of the spindles for our curved stair rail inside as well.










Tuesday, August 18, 2009

Grout, Stain & Door Hardware

Today our grout work was finished as you can see by the fireplace photo. Now, all tile work is completed. In addition, we are on phase 2 of the stain work for our wood floors. Don't they look awesome?!?!?! We also got most of our door hardware installed. And as an added bonus, our Master Shower door was installed! Things are really coming together quickly. We can't wait to get back out to the house tomorrow to see what else has happened!






Monday, August 17, 2009

Insulation, Grout and Stain

We have yet another day of work done on the house and some more transformations have occurred. We now have our basement insulated! While we won't be finishing it off right away, we do plan on using this space quickly so the insulation will help until we can get it done.

On top of that, the grout work for our tile flooring was done today, the tile surround for the fireplace was finished and they sanded and stained our wood floors! They look awesome and we can't wait until they finish.